Residential Complex "Dream Towers" - Construction Progress

The residential complex "Dream Towers" is a modern multifunctional project, including business-class residential buildings, commercial premises and public areas. The project is being implemented using advanced monolithic housing construction technologies and energy-efficient materials.

Main stages of construction

  • Preparatory work
    Engineering surveys and site planning have been carried out, fencing of the construction site has been installed, and temporary power and water supply lines have been connected.

  • Foundation and frame of buildings

    • the construction of a pile foundation and a monolithic foundation slab has been completed,

    • the construction of the reinforced concrete frame of the towers is underway,

    • installation of ceilings and vertical structures is carried out.

  • Facade and exterior works

    • installation of ventilated facade systems and panoramic glazing,

    • insulation and cladding of facades with modern materials,

    • installation of roofing and drainage systems.

  • Interior works

    • installation of utility lines (heating, ventilation, air conditioning, power supply and water supply),

    • installation of elevator equipment and fire-fighting systems,

    • carrying out rough and final finishing of apartments and public areas.

  • Infrastructure and improvement

    • construction of an underground multi-level parking lot,

    • landscaping and improvement of the local area,

    • organization of children's and sports playgrounds, walking areas.