Residential Complex "Dream Towers" - Construction Progress
The residential complex "Dream Towers" is a modern multifunctional project, including business-class residential buildings, commercial premises and public areas. The project is being implemented using advanced monolithic housing construction technologies and energy-efficient materials.
Main stages of construction
-
Preparatory work
Engineering surveys and site planning have been carried out, fencing of the construction site has been installed, and temporary power and water supply lines have been connected. -
Foundation and frame of buildings
-
the construction of a pile foundation and a monolithic foundation slab has been completed,
-
the construction of the reinforced concrete frame of the towers is underway,
-
installation of ceilings and vertical structures is carried out.
-
-
Facade and exterior works
-
installation of ventilated facade systems and panoramic glazing,
-
insulation and cladding of facades with modern materials,
-
installation of roofing and drainage systems.
-
-
Interior works
-
installation of utility lines (heating, ventilation, air conditioning, power supply and water supply),
-
installation of elevator equipment and fire-fighting systems,
-
carrying out rough and final finishing of apartments and public areas.
-
-
Infrastructure and improvement
-
construction of an underground multi-level parking lot,
-
landscaping and improvement of the local area,
-
organization of children's and sports playgrounds, walking areas.
-