Southern River Terminal and Business Center – Construction Progress

The project "South River Terminal and Business Center" is a large-scale complex that combines a modern passenger water transport terminal and multifunctional office spaces. The project is aimed at creating a new transport and business hub for the capital.

Main stages of construction

  • Preparatory work
    Engineering surveys, site clearing and temporary infrastructure installation have been carried out. Construction camps have been set up, temporary power and water supply lines have been installed.

  • Foundation and frame

    • the construction of a pile field and monolithic foundation slabs has been completed,

    • the reinforced concrete frame of the station and business center towers is being erected,

    • The installation of ceilings and load-bearing columns is underway.

  • Facade and exterior works

    • installation of ventilated facade systems and panoramic glazing,

    • installation of roofing with modern waterproofing materials,

    • installation of suspended architectural elements.

  • Internal engineering systems

    • installation of ventilation, air conditioning and heating systems,

    • installation of electrical networks, communication and fire safety systems,

    • preparation of premises for passenger areas and office spaces.

  • Infrastructure and improvement

    • construction of berthing facilities and access roads,

    • construction of parking complexes,

    • improvement of the adjacent territory with landscaping and pedestrian zones.