Southern River Terminal and Business Center – Construction Progress
The project "South River Terminal and Business Center" is a large-scale complex that combines a modern passenger water transport terminal and multifunctional office spaces. The project is aimed at creating a new transport and business hub for the capital.
Main stages of construction
-
Preparatory work
Engineering surveys, site clearing and temporary infrastructure installation have been carried out. Construction camps have been set up, temporary power and water supply lines have been installed. -
Foundation and frame
-
the construction of a pile field and monolithic foundation slabs has been completed,
-
the reinforced concrete frame of the station and business center towers is being erected,
-
The installation of ceilings and load-bearing columns is underway.
-
-
Facade and exterior works
-
installation of ventilated facade systems and panoramic glazing,
-
installation of roofing with modern waterproofing materials,
-
installation of suspended architectural elements.
-
-
Internal engineering systems
-
installation of ventilation, air conditioning and heating systems,
-
installation of electrical networks, communication and fire safety systems,
-
preparation of premises for passenger areas and office spaces.
-
-
Infrastructure and improvement
-
construction of berthing facilities and access roads,
-
construction of parking complexes,
-
improvement of the adjacent territory with landscaping and pedestrian zones.
-