Mining and Processing Plant – Construction Progress
The construction of a mining and processing plant (MPP) is a strategically important project in the field of mining and processing of mineral raw materials. The main focus is on the creation of a modern production complex, including a quarry, a processing plant and developed infrastructure.
Main stages of construction
-
Preparatory work
Engineering surveys, clearing of the territory and organization of the construction site have been completed. Temporary roads and power supply lines have been laid. -
Career
-
carrying out blasting and stripping operations,
-
construction of transport ramps and drainage systems,
-
preparation of sites for the placement of mining and transport equipment.
-
-
Enrichment plant
-
construction of crushing, grinding and flotation facilities,
-
installation of metal structures and laying of foundations for heavy technological equipment,
-
installation of crushers, mills and flotation machines.
-
-
Engineering infrastructure
-
construction of power supply facilities (substations, power lines),
-
construction of water treatment plants and tailings storage facilities,
-
organization of warehouses and repair shops.
-
-
Social and domestic facilities
-
construction of an administrative and domestic building,
-
construction of a residential village for workers,
-
creation of access roads and transport hubs.
-