top of page
7 лион гате.webp

Residential Complex "LION GRATE" - Construction Progress

The residential complex "LION GRATE" is a modern comfort-class project, providing for the construction of apartment buildings with developed infrastructure and landscaped territory. Modern construction technologies and environmentally friendly materials are used at all stages of implementation.

Main stages of construction

  • Preparatory work
    Geological surveys, clearing of the territory and arrangement of the construction site were carried out. Perimeter fencing and installation of temporary utility lines were completed.

  • Foundation and frame

    • the construction of a pile field and a monolithic foundation has been completed,

    • the construction of the reinforced concrete frame of the buildings is underway,

    • installation of ceilings and vertical structures is carried out.

  • External works

    • installation of facade panels and stained glass systems,

    • insulation and cladding of facades with modern materials,

    • installation of roofing and drainage systems.

  • Interior works

    • installation of utility networks (electricity supply, heating, ventilation, water supply),

    • construction of partitions, rough and fine finishing of premises,

    • installation of elevators and fire safety systems.

  • Improvement of the territory

    • construction of children's and sports playgrounds,

    • landscaping of courtyard areas,

    • organization of underground and above-ground parking.

bottom of page