top of page
5 удокан.jpg

Udokan MMC – Construction of the largest copper enterprise in Russia

The Udokan Mining and Metallurgical Plant is a large-scale investment project for the development of one of the world's largest copper deposits. The project involves the construction of a modern enterprise with a full production cycle - from ore mining to the production of finished cathode copper.

Construction stages

  • Preparatory work: development of design documentation, engineering surveys, creation of basic infrastructure.

  • Mining operations: construction of open pit mines, transport lines and ore delivery systems.

  • Enrichment plant: construction of ore crushing and grinding buildings, installation of flotation and hydrometallurgical equipment.

  • Metallurgical complex: construction of electrolysis and refining shops, installation of modern equipment for the production of cathode copper.

  • Infrastructure: power supply, water treatment facilities, storage facilities, transport hubs.

  • Environmental component: implementation of closed water circulation technologies, reclamation and minimization of production waste.

Current status

Active construction and installation work is underway at the facility. High-tech equipment is supplied by leading global companies. Commissioning of the plant will ensure a significant increase in Russia's share in the global copper market and will also become a driver of economic development for the Zabaikalsky Krai.

Mining and Processing Plant "Ozerny" - Construction and Development

The Ozerny Mining and Processing Plant is one of the largest investment projects in the field of mining and processing of polymetallic ores in Russia. The project is aimed at creating a modern full-cycle enterprise, including mining, enrichment and subsequent processing of ores.

Construction stages

  • Design and preparatory work: development of design documentation, geological and geodetic surveys, formation of an infrastructure base.

  • Mining operations: construction of quarries and mine workings, creation of a transport system for ore delivery.

  • Enrichment plant: construction of production buildings, installation of crushing, flotation and filtration equipment.

  • Infrastructure: construction of power supply, water treatment facilities, warehouse complexes, highways and railway access roads.

  • Environmental safety: implementation of modern waste disposal technologies and closed water circulation.

Current status

Large-scale construction and installation works are underway. In parallel, modern equipment from leading global manufacturers is being delivered. The implementation of the project will create hundreds of new jobs and make a significant contribution to the development of the region.

bottom of page